Since the power failure this morning, AMM has not had data connectivity beyond the building.
As an attempt to resolve this, the core switch at struben building will be power cycled at 11:30
This takes just a few seconds, during which time everyone will lose visibility beyond their local network.
We regret any inconvenience caused.